Project Fox West
An offsite data storage specialist has utilised the expertise of Billington Structures to incorporate 800 tonnes of steel to form a mezzanine floor to create a new Data Centre.
The mezzanine floor was erected within an existing warehouse building which had been stood empty for some time. Billington Structures erected the steel internally by cutting the foundations out of the existing floor. The mezzanine floor will be separate to the main building frame and the enclosed unit is water tight to provide maximum protection for the important data being stored.
End Client
ISDC DEVELOPMENTS (NO.3) LTD
Main Contractor
Mace Technology
Engineer
Design Consultancy
Architect
TTSP
Value
£2,000,000