Wakefield Waste PFI
Wakefield Waste PFI
Wakefield Waste PFI
Wakefield Waste PFI
Billington Structures are providing the steel framework for 7 buildings across 2 sites with a weight of approximately 1200 tonnes of steel.
6 of the buildings will be built in South Kirby, West Yorkshire for a residual waste treatment facility which will recycle waste from the Wakefield District transforming it into valuable products and green energy. There will also be a visitor centre at the site to be used for the purpose of waste education and the promotion of waste minimisation.
This project will have a positive effect on the local economy by generating many permanent jobs and increase its recycling rate by a minimum of 13%.
End Client
SHANKS
Main Contractor
Kier Infrastructure & Overseas Ltd
ARCHITECT
CPMG Architects
Value
£1,700,000